Hi,
I have a need to automatically reconnect and re-attach Ozone to my target after a hardware reset. I need to perform this action because i am doing automatic coverage tests using semihosting and some test cases require a reset of the board. Currently, when i perform a reset during a debug session, it shows a pop up telling me "Failed to read target status. Abort debug session?" which is understandable. Now, i was wondering if there are some options or settings that would allow me to do that?
Thanks for your help.
I have a need to automatically reconnect and re-attach Ozone to my target after a hardware reset. I need to perform this action because i am doing automatic coverage tests using semihosting and some test cases require a reset of the board. Currently, when i perform a reset during a debug session, it shows a pop up telling me "Failed to read target status. Abort debug session?" which is understandable. Now, i was wondering if there are some options or settings that would allow me to do that?
Thanks for your help.