Hi,
currently I am programming some boards at my desk with J-Link Ultra+ and J-Flash.
The target is powered through the J-Link.
Doing "Production Programming" by pressing F7 works just fine, but target power persists after programming ended successfully. I have to go to the menu and disconnect the target manually to disable target power.
This is quite annoying. Either the target power should be disabled automatically after "Production Programming" succeeds (perhaps configurable in project settings) or alternatively there should be a hotkey for disconnect. I absolutely prefer the first variant.
I cannot think of any reason, why target power should stay enabled after "Production Programming"...
Best regards
Martin
currently I am programming some boards at my desk with J-Link Ultra+ and J-Flash.
The target is powered through the J-Link.
Doing "Production Programming" by pressing F7 works just fine, but target power persists after programming ended successfully. I have to go to the menu and disconnect the target manually to disable target power.
This is quite annoying. Either the target power should be disabled automatically after "Production Programming" succeeds (perhaps configurable in project settings) or alternatively there should be a hotkey for disconnect. I absolutely prefer the first variant.
I cannot think of any reason, why target power should stay enabled after "Production Programming"...
Best regards
Martin